Project directory

Real U.S. data-center projects, with publicly documented equipment, design and construction scope.

Public project references, not Gulfstream clients, placements or recruiting assignments. Owners, developers and contractor names are omitted. Equipment brands and project teams are not assigned without exact-project evidence.

Statuses are dated historical source reports, not live inspections. City/county locations are approximate; this is not an exhaustive national inventory.

Project map · Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Data-center projects

Hyperscale campus in Glendale · dc-5

Glendale, Maricopa County, Arizona · hyperscale campus · Reported under construction

72 MW, 100-acre campus

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

The April 2025 project announcement specifies air-cooling arrays that capture heat at the source and a closed-loop cooling system that recycles water. These are announced design provisions, not confirmation of installed or operating equipment.

City project announcement · Source dated 2025-04-15 · Checked 2026-10-22

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Mesa · dc-7

Mesa, Maricopa County, Arizona · hyperscale campus · Reported under construction

450+ MW market expansion

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-05-20. 450+ MW is aggregate existing-plus-expansion scope. The source distinguishes an operating facility from two buildings under construction.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Phoenix · dc-6

Phoenix, Maricopa County, Arizona · hyperscale campus · Reported announced

$33 billion, 3,300 acres, up to 3 GW

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Data center groundbreaking in Miami · dc-fl-miami

Miami, Miami-Dade County, Florida · colocation facility · Reported under construction

16 MW, 150,000 sq ft

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-02-26. Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Cable landing station in Palm Coast · dc-fl-palm-coast

Palm Coast, Flagler County, Florida · cable landing station · Reported under construction

One approved building, 33,760 sq ft

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-06-19. The city reported construction underway June 19, 2026, with one permitted cable landing station. No second building is approved; this is not a hyperscale campus.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Fairburn · dc-11

Fairburn, Fulton County, Georgia · hyperscale campus · Reported announced

1.2 GW, 20 buildings, about $16 billion

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-05. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Forest Park · dc-12

Forest Park, Clayton County, Georgia · hyperscale campus · Reported announced

$2 billion, 200 MW, 1.9 million sq ft

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Elk Grove Village · dc-41

Elk Grove Village, Cook County, Illinois · AI campus · Reported announced

36 MW, 263,000 sq ft

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Grayslake · dc-42

Grayslake, Lake County, Illinois · hyperscale campus · Reported under construction

1.2 GW IT capacity, 20 buildings

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-10-16. October reporting says construction started in August; operation is not confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Franklin Township · dc-36

Franklin Township, Indianapolis, Indiana · hyperscale campus · Reported withdrawn

$1 billion, 467-acre site

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-10-01. Plans formally withdrawn; this is not an active construction opportunity.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Ankeny · dc-31

Ankeny, Polk County, Iowa · AI campus · Reported under construction

13.2 MW, 105,000 sq ft

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-08-06. Structural topping out reported; operation is not confirmed.

Project source

Equipment, design and construction

Equipment & systems

The August 2025 topping-out announcement specifies advanced closed-loop waterless cooling for high-density AI workloads. It describes the planned cooling system, not evidence that the plant is commissioned or operational.

Official topping-out announcement · Source dated 2025-08-06 · Checked 2026-10-22

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

The project announcement identifies a design-build delivery team and reports structural topping out. No separate mechanical subcontractor work package is verified; team identities are omitted.

Official topping-out announcement · Source dated 2025-08-06 · Checked 2026-10-22

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Cedar Rapids and Council Bluffs · dc-30

Cedar Rapids and Council Bluffs, Iowa · hyperscale campus · Reported announced

$7 billion investment

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-05-30. Construction was reported for Cedar Rapids. The statewide investment also includes other components; this does not establish every component's status.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Council Bluffs · dc-32

Council Bluffs, Pottawattamie County, Iowa · AI campus · Reported under construction

200 MW

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-10-29. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Richland Parish · dc-34

Richland Parish, Louisiana · hyperscale campus · Reported under construction

Planned 5 GW expansion; more than $50 billion regional investment

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-07-13. The July 2026 expansion announcement updates the regional investment and planned capacity; no full-campus operation is established.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Las Vegas · dc-19

Las Vegas, Clark County, Nevada · AI campus · Reported under construction

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Colocation in Moapa · dc-20

Moapa, Clark County, Nevada · colocation · Reported announced

50 MW, 20 acres

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-12-23. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Storey County (Reno area) · dc-17

Storey County (Reno area), Nevada · AI campus · Reported announced

224 MW, 137 acres, about $3 billion

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-07-15. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Colocation in Storey County (Reno area) · dc-18

Storey County (Reno area), Nevada · colocation · Reported operating

60 MW, 300,000 sq ft

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Charlotte · dc-26

Charlotte, Mecklenburg County, North Carolina · hyperscale campus · Reported announced

122-acre powered shell campus

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-01. The undated official page reports grading underway; no dated vertical-construction milestone is confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in West Charlotte · dc-27

West Charlotte, Mecklenburg County, North Carolina · hyperscale campus · Reported announced

3 million sq ft, up to 400 MW, 156 acres

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Central Ohio · dc-15

Central Ohio, Ohio · hyperscale campus · Reported announced

$10 billion investment plan

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2024-12-10. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in New Albany · dc-14

New Albany, Heath and Hebron, Ohio · hyperscale campus · Reported announced

$1 billion first phase, three campuses

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-04. Site preparation commenced at the planned Ohio campuses; vertical construction was still planned, not confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Wood County · dc-13

Wood County, Ohio · AI campus · Reported announced

$800 million, 715,000 sq ft, 280 acres

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Colocation in Hillsboro · dc-43

Hillsboro, Washington County, Oregon · colocation · Reported announced

27 MW, 350,000 sq ft

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-09. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Falls Township · dc-40

Falls Township, Bucks County, Pennsylvania · hyperscale campus · Reported under construction

Part of a $20 billion two-campus plan

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-06. The undated official page lists active construction in Falls Township; no current completion date is confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Salem Township · dc-39

Salem Township, Luzerne County, Pennsylvania · hyperscale campus · Reported under construction

Part of a $20 billion two-campus plan

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-06. The undated official page lists active construction in Salem Township; no current completion date is confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Memphis · dc-33

Memphis, Shelby County, Tennessee · AI campus · Reported under construction

1 million sq ft site

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Bastrop County · dc-25

Bastrop County, Texas · hyperscale campus · Reported under construction

$1.44 billion campus, 578,000 sq ft, 140 acres

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Dallas-Fort Worth · dc-9

Dallas-Fort Worth, Texas · hyperscale campus · Reported announced

768-acre multi-phase campus

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Fort Worth · dc-8

Fort Worth, Tarrant County, Texas · hyperscale campus · Reported under construction

About 70 MW initial IT capacity

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

The groundbreaking announcement describes a multi-building campus with approximately 70 MW of initial IT capacity. The source does not identify the mechanical equipment schedule or engineering team.

Official groundbreaking announcement · Source dated 2025-04-04 · Checked 2026-10-22

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Lancaster · dc-10

Lancaster, Dallas County, Texas · hyperscale campus · Reported announced

550 MW, 163 acres

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Medina County (west of San Antonio) · dc-23

Medina County (west of San Antonio), Texas · hyperscale campus · Reported under construction

$900 million, 300 MW, 440 acres

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Colocation in Round Rock · dc-24

Round Rock, Williamson County, Texas · colocation · Reported under construction

54 MW total, 18 MW first phase

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in San Antonio · dc-21

San Antonio, Bexar County, Texas · hyperscale campus · Reported under construction

214,526 sq ft, about $272 million

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in San Antonio · dc-22

San Antonio, Bexar County, Texas · hyperscale campus · Reported under construction

276,000 sq ft, 36 MW

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2024-07-18. Groundbreaking reported July 2024; completion of both buildings is not confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in West Jordan · dc-16

West Jordan, Salt Lake County, Utah · AI campus · Reported under construction

175 MW, 100-acre campus

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Caroline County · dc-29

Caroline County, Virginia · hyperscale campus · Reported under construction

$3 billion, nearly 1 GW

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Chantilly · dc-3

Chantilly, Fairfax County, Virginia · hyperscale campus · Reported under construction

45 MW, 240,000 sq ft

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Culpeper County · dc-4

Culpeper County, Virginia · hyperscale campus · Reported announced

196 MW critical IT load, 920,000 sq ft, two buildings

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2024-07. Updated marketed scope from the official location page; construction status is not independently confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Marketed as two data centers totaling 920,000 sq ft and 196 MW of critical IT load, with power-density-focused campus planning. This is published design capacity, not proof of installed equipment or completion.

Official campus specifications · Source undated · Checked 2026-10-22

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Colocation in Henrico County · dc-28

Henrico County, Virginia · colocation · Reported under construction

$1 billion, 66 acres, 200+ MW

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-07-15. Groundbreaking and completed precast structure reported for the first facility; not full-campus operation.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

The published campus plan covers 66 acres and more than 1.1 million sq ft at full development, scaling from 48 MW to over 200 MW. Planned full-build capacity is not an operating-capacity claim.

Official construction update · Source dated 2026-08-24 · Checked 2026-10-22

Contractor & construction scope

The August 2026 update reports a July 15 ceremonial groundbreaking, a completed precast structure and concrete slab placement following. These are first-facility construction milestones, not full-campus completion; contractor identities are omitted.

Official construction update · Source dated 2026-08-24 · Checked 2026-10-22

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Stafford County · dc-1

Stafford County, Virginia · hyperscale campus · Reported under construction

1+ GW, 500 acres, 19 buildings

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-05-26. First building topped out; not evidence that the entire campus is operational.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Stafford County · dc-2

Stafford County, Virginia · hyperscale campus · Reported under construction

$2 billion, 929,000 sq ft

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-11-07. Groundbreaking reported for a three-building, 192 MW campus; operation is not confirmed.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

AI campus in Mount Pleasant · dc-37

Mount Pleasant, Racine County, Wisconsin · AI campus · Reported under construction

$7 billion total investment

Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-23. The first facility was reported operational on June 23, 2026. This does not establish completion of the entire campus.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Hyperscale campus in Port Washington · dc-38

Port Washington, Ozaukee County, Wisconsin · hyperscale campus · Reported under construction

$15 billion overall campus; $8 billion first phase

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-12-19. Groundbreaking reported; the first-phase budget is not the entire campus budget.

Project source

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Featured hiring & salary guides

  • HVAC Service Manager Salary by Metro (2026)
  • Mechanical Superintendent Salary Guide (2026)
  • Controls / BAS Project Manager Salary Guide (2026)
  • How to Hire a Piping Superintendent (2026 Playbook)
  • Open Jobs
  • For Employers
  • For Candidates
  • Candidate Hub
  • 2026 Salary Guides
  • All Insights
  • Hiring & Salary Guides
  • Meet the Team
  • Regional Trade Reports
  • Local Unions Directory
  • Markets We Recruit In
  • About Gulfstream SP
  • Contact
  • Trust & Security
  • Privacy Policy