New Albany, Heath and Hebron, Ohio · hyperscale campus · $1 billion first phase, three campuses
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-04. Site preparation commenced at the planned Ohio campuses; vertical construction was still planned, not confirmed.
Source checked 2026-10-22; not a current-status confirmation.
Project status source · Project directory · Project map
Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.
Not verified
Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.
Not verified
Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.
Not verified
Reference guides-not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream
Announced Oct 2024. Reported announced; Site preparation commenced at the planned Ohio campuses; vertical construction was still planned, not confirmed.