Publicly sourced data center projects mapped at city and county level, with status. Owner and developer names are kept confidential; sources are cited on each project.
Statuses are dated source reports, not live inspections. Weekly checks do not establish complete national coverage.
64 projects
Stafford County, Virginia · Reported under construction · announced Jan 2025
1+ GW, 500 acres, 19 buildings
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-05-26. First building topped out; not evidence that the entire campus is operational.
Public sourceStafford County, Virginia · Reported under construction · announced Nov 2025
$2 billion, 929,000 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-11-07. Groundbreaking reported for a three-building, 192 MW campus; operation is not confirmed.
Public sourceChantilly, Fairfax County, Virginia · Reported under construction · announced Nov 2025
45 MW, 240,000 sq ft
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.
Public sourceCulpeper County, Virginia · Reported announced · announced Jul 2024
196 MW critical IT load, 920,000 sq ft, two buildings
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2024-07. Updated marketed scope from the official location page; construction status is not independently confirmed.
Public sourceGlendale, Maricopa County, Arizona · Reported under construction · announced Apr 2025
72 MW, 100-acre campus
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.
Public sourcePhoenix, Maricopa County, Arizona · Reported announced · announced Jul 2025
$33 billion, 3,300 acres, up to 3 GW
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceMesa, Maricopa County, Arizona · Reported under construction · announced May 2025
450+ MW market expansion
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-05-20. 450+ MW is aggregate existing-plus-expansion scope. The source distinguishes an operating facility from two buildings under construction.
Public sourceFort Worth, Tarrant County, Texas · Reported under construction · announced Apr 2025
About 70 MW initial IT capacity
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.
Public sourceDallas-Fort Worth, Texas · Reported announced · announced Jan 2025
768-acre multi-phase campus
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.
Public sourceLancaster, Dallas County, Texas · Reported announced · announced Aug 2025
550 MW, 163 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.
Public sourceFairburn, Fulton County, Georgia · Reported announced · announced May 2025
1.2 GW, 20 buildings, about $16 billion
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-05. Historical source report; current project status has not been independently confirmed.
Public sourceForest Park, Clayton County, Georgia · Reported announced · announced Jul 2025
$2 billion, 200 MW, 1.9 million sq ft
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceWood County, Ohio · Reported announced · announced Apr 2025
$800 million, 715,000 sq ft, 280 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.
Public sourceNew Albany, Heath and Hebron, Ohio · Reported announced · announced Oct 2024
$1 billion first phase, three campuses
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-04. Site preparation commenced at the planned Ohio campuses; vertical construction was still planned, not confirmed.
Public sourceCentral Ohio, Ohio · Reported announced · announced Dec 2024
$10 billion investment plan
Pending: project announced; construction or operation is not confirmed.
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2024-12-10. Historical source report; current project status has not been independently confirmed.
Public sourceWest Jordan, Salt Lake County, Utah · Reported under construction · announced Mar 2025
175 MW, 100-acre campus
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.
Public sourceStorey County (Reno area), Nevada · Reported announced · announced Jul 2025
224 MW, 137 acres, about $3 billion
Pending: project announced; construction or operation is not confirmed.
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-07-15. Historical source report; current project status has not been independently confirmed.
Public sourceStorey County (Reno area), Nevada · Reported operating · announced Jul 2025
60 MW, 300,000 sq ft
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceLas Vegas, Clark County, Nevada · Reported under construction · announced Jul 2025
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceMoapa, Clark County, Nevada · Reported announced · announced Dec 2025
50 MW, 20 acres
Pending: project announced; construction or operation is not confirmed.
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-12-23. Historical source report; current project status has not been independently confirmed.
Public sourceSan Antonio, Bexar County, Texas · Reported under construction · announced Oct 2025
214,526 sq ft, about $272 million
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.
Public sourceSan Antonio, Bexar County, Texas · Reported under construction · announced Jul 2024
276,000 sq ft, 36 MW
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2024-07-18. Groundbreaking reported July 2024; completion of both buildings is not confirmed.
Public sourceMedina County (west of San Antonio), Texas · Reported under construction · announced Aug 2025
$900 million, 300 MW, 440 acres
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.
Public sourceRound Rock, Williamson County, Texas · Reported under construction · announced Jul 2025
54 MW total, 18 MW first phase
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceBastrop County, Texas · Reported under construction · announced Jul 2025
$1.44 billion campus, 578,000 sq ft, 140 acres
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceCharlotte, Mecklenburg County, North Carolina · Reported announced · announced Jan 2025
122-acre powered shell campus
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-01. The undated official page reports grading underway; no dated vertical-construction milestone is confirmed.
Public sourceWest Charlotte, Mecklenburg County, North Carolina · Reported announced · announced Apr 2025
3 million sq ft, up to 400 MW, 156 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.
Public sourceHenrico County, Virginia · Reported under construction · announced Feb 2025
$1 billion, 66 acres, 200+ MW
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-07-15. Groundbreaking and completed precast structure reported for the first facility; not full-campus operation.
Public sourceCaroline County, Virginia · Reported under construction · announced Nov 2025
$3 billion, nearly 1 GW
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.
Public sourceCedar Rapids and Council Bluffs, Iowa · Reported announced · announced May 2025
$7 billion investment
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-05-30. Construction was reported for Cedar Rapids. The statewide investment also includes other components; this does not establish every component's status.
Public sourceAnkeny, Polk County, Iowa · Reported under construction · announced Mar 2025
13.2 MW, 105,000 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-08-06. Structural topping out reported; operation is not confirmed.
Public sourceCouncil Bluffs, Pottawattamie County, Iowa · Reported under construction · announced Oct 2025
200 MW
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-10-29. Historical source report; current project status has not been independently confirmed.
Public sourceMemphis, Shelby County, Tennessee · Reported under construction · announced Mar 2025
1 million sq ft site
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.
Public sourceRichland Parish, Louisiana · Reported under construction · announced Dec 2024
Planned 5 GW expansion; more than $50 billion regional investment
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-07-13. The July 2026 expansion announcement updates the regional investment and planned capacity; no full-campus operation is established.
Public sourceMount Pleasant, Racine County, Wisconsin · Reported under construction · announced Sep 2025
$7 billion total investment
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-23. The first facility was reported operational on June 23, 2026. This does not establish completion of the entire campus.
Public sourcePort Washington, Ozaukee County, Wisconsin · Reported under construction · announced Aug 2025
$15 billion overall campus; $8 billion first phase
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-12-19. Groundbreaking reported; the first-phase budget is not the entire campus budget.
Public sourceSalem Township, Luzerne County, Pennsylvania · Reported under construction · announced Jun 2025
Part of a $20 billion two-campus plan
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-06. The undated official page lists active construction in Salem Township; no current completion date is confirmed.
Public sourceFalls Township, Bucks County, Pennsylvania · Reported under construction · announced Jun 2025
Part of a $20 billion two-campus plan
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-06. The undated official page lists active construction in Falls Township; no current completion date is confirmed.
Public sourceElk Grove Village, Cook County, Illinois · Reported announced · announced Mar 2025
36 MW, 263,000 sq ft
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.
Public sourceGrayslake, Lake County, Illinois · Reported under construction · announced Feb 2025
1.2 GW IT capacity, 20 buildings
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-10-16. October reporting says construction started in August; operation is not confirmed.
Public sourceHillsboro, Washington County, Oregon · Reported announced · announced Sep 2025
27 MW, 350,000 sq ft
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-09. Historical source report; current project status has not been independently confirmed.
Public sourcePalm Coast, Flagler County, Florida · Reported under construction · announced Jul 2025
One approved building, 33,760 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-06-19. The city reported construction underway June 19, 2026, with one permitted cable landing station. No second building is approved; this is not a hyperscale campus.
Public sourceMiami, Miami-Dade County, Florida · Reported under construction · announced Feb 2025
16 MW, 150,000 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-02-26. Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.
Public sourceCheyenne, Laramie County, Wyoming · Reported under construction · announced Oct 2025
$1.2 billion, 250 MW, 113 acres
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.
Public sourceHarwood, Cass County, North Dakota · Reported announced · announced Aug 2025
$3 billion, 280 MW initial campus design
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.
Public sourceKansas City, Wyandotte County, Kansas · Reported announced · announced Jul 2025
$2.4 billion, about 200 MW critical IT, 66 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.
Public sourceKansas City, Wyandotte County, Kansas · Reported announced · announced Jun 2025
$12 billion, 600 MW, 500+ acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-06. Historical source report; current project status has not been independently confirmed.
Public sourceKansas City, Clay County, Missouri · Reported announced · announced Mar 2024
$1 billion
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-03. Historical source report; current project status has not been independently confirmed.
Public sourceLouisville, Jefferson County, Kentucky · Reported announced · announced Jan 2025
400 MW, first 130 MW targeted for Oct 2026
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.
Public sourceAiken, Aiken County, South Carolina · Reported announced · announced Aug 2024
$800 million, 715,000 sq ft
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-08. Historical source report; current project status has not been independently confirmed.
Public sourceSt. George, Dorchester County, South Carolina · Reported under construction · announced Sep 2024
Part of a $2 billion two-campus investment
Pending: dated source confirmation of the reported status is still needed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-09. Historical source report; current project status has not been independently confirmed.
Public sourceMontgomery, Montgomery County, Alabama · Reported announced · announced May 2024
$800 million, 715,000 sq ft
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-05. Historical source report; current project status has not been independently confirmed.
Public sourceCanton, Madison County, Mississippi · Reported announced · announced Jan 2024
$10 billion across two county data-center complexes
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-01. Historical source report; current project status has not been independently confirmed.
Public sourceMeridian, Lauderdale County, Mississippi · Reported announced · announced Jan 2025
About $10 billion at full build, about 500 MW, eight buildings
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.
Public sourceBrandon, Rankin County, Mississippi · Reported announced · announced Aug 2025
$6 billion
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.
Public sourceVicksburg, Warren County, Mississippi · Reported announced · announced Nov 2025
$3 billion
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.
Public sourceRosemount, Dakota County, Minnesota · Reported announced · announced Mar 2024
$800 million, 715,000 sq ft, 280 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-03. Historical source report; current project status has not been independently confirmed.
Public sourceSaline Township, Washtenaw County, Michigan · Reported announced · announced Oct 2025
$7 billion, 1+ GW
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.
Public sourceVineland, Cumberland County, New Jersey · Reported announced · announced Mar 2025
300 MW
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.
Public sourceLansing, Tompkins County, New York · Reported announced · announced Aug 2025
Up to 400 MW, about 183 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.
Public sourceSanta Teresa, Doña Ana County, New Mexico · Reported announced · announced Sep 2025
$50 billion initial investment over five years
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-09. Historical source report; current project status has not been independently confirmed.
Public sourceRockingham, Richmond County, North Carolina · Reported announced · announced Jun 2025
$10 billion
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-06. Historical source report; current project status has not been independently confirmed.
Public sourceSioux Falls, Minnehaha County, South Dakota · Reported announced · announced Aug 2025
500 MW power load, 160 acres
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.
Public sourceToronto, Deuel County, South Dakota · Reported announced · announced May 2025
Up to $16 billion, 430 MW IT
Pending: project announced; construction or operation is not confirmed.
Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-05. Historical source report; current project status has not been independently confirmed.