Home › Data centers › Projects

Data center projects map

Publicly sourced data center projects mapped at city and county level, with status. Owner and developer names are kept confidential; sources are cited on each project.

Statuses are dated source reports, not live inspections. Weekly checks do not establish complete national coverage.

64 projects

  • Hyperscale campus in Stafford County

    Stafford County, Virginia · Reported under construction · announced Jan 2025

    1+ GW, 500 acres, 19 buildings

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-05-26. First building topped out; not evidence that the entire campus is operational.

    Public source
  • Hyperscale campus in Stafford County

    Stafford County, Virginia · Reported under construction · announced Nov 2025

    $2 billion, 929,000 sq ft

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-11-07. Groundbreaking reported for a three-building, 192 MW campus; operation is not confirmed.

    Public source
  • Hyperscale campus in Chantilly

    Chantilly, Fairfax County, Virginia · Reported under construction · announced Nov 2025

    45 MW, 240,000 sq ft

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Culpeper County

    Culpeper County, Virginia · Reported announced · announced Jul 2024

    196 MW critical IT load, 920,000 sq ft, two buildings

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2024-07. Updated marketed scope from the official location page; construction status is not independently confirmed.

    Public source
  • Hyperscale campus in Glendale

    Glendale, Maricopa County, Arizona · Reported under construction · announced Apr 2025

    72 MW, 100-acre campus

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Phoenix

    Phoenix, Maricopa County, Arizona · Reported announced · announced Jul 2025

    $33 billion, 3,300 acres, up to 3 GW

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Mesa

    Mesa, Maricopa County, Arizona · Reported under construction · announced May 2025

    450+ MW market expansion

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-05-20. 450+ MW is aggregate existing-plus-expansion scope. The source distinguishes an operating facility from two buildings under construction.

    Public source
  • Hyperscale campus in Fort Worth

    Fort Worth, Tarrant County, Texas · Reported under construction · announced Apr 2025

    About 70 MW initial IT capacity

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Dallas-Fort Worth

    Dallas-Fort Worth, Texas · Reported announced · announced Jan 2025

    768-acre multi-phase campus

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Lancaster

    Lancaster, Dallas County, Texas · Reported announced · announced Aug 2025

    550 MW, 163 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Fairburn

    Fairburn, Fulton County, Georgia · Reported announced · announced May 2025

    1.2 GW, 20 buildings, about $16 billion

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-05. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Forest Park

    Forest Park, Clayton County, Georgia · Reported announced · announced Jul 2025

    $2 billion, 200 MW, 1.9 million sq ft

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Wood County

    Wood County, Ohio · Reported announced · announced Apr 2025

    $800 million, 715,000 sq ft, 280 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in New Albany

    New Albany, Heath and Hebron, Ohio · Reported announced · announced Oct 2024

    $1 billion first phase, three campuses

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-04. Site preparation commenced at the planned Ohio campuses; vertical construction was still planned, not confirmed.

    Public source
  • Hyperscale campus in Central Ohio

    Central Ohio, Ohio · Reported announced · announced Dec 2024

    $10 billion investment plan

    Pending: project announced; construction or operation is not confirmed.

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2024-12-10. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in West Jordan

    West Jordan, Salt Lake County, Utah · Reported under construction · announced Mar 2025

    175 MW, 100-acre campus

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Storey County (Reno area)

    Storey County (Reno area), Nevada · Reported announced · announced Jul 2025

    224 MW, 137 acres, about $3 billion

    Pending: project announced; construction or operation is not confirmed.

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-07-15. Historical source report; current project status has not been independently confirmed.

    Public source
  • Colocation in Storey County (Reno area)

    Storey County (Reno area), Nevada · Reported operating · announced Jul 2025

    60 MW, 300,000 sq ft

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Las Vegas

    Las Vegas, Clark County, Nevada · Reported under construction · announced Jul 2025

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • Colocation in Moapa

    Moapa, Clark County, Nevada · Reported announced · announced Dec 2025

    50 MW, 20 acres

    Pending: project announced; construction or operation is not confirmed.

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-12-23. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in San Antonio

    San Antonio, Bexar County, Texas · Reported under construction · announced Oct 2025

    214,526 sq ft, about $272 million

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in San Antonio

    San Antonio, Bexar County, Texas · Reported under construction · announced Jul 2024

    276,000 sq ft, 36 MW

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2024-07-18. Groundbreaking reported July 2024; completion of both buildings is not confirmed.

    Public source
  • Hyperscale campus in Medina County (west of San Antonio)

    Medina County (west of San Antonio), Texas · Reported under construction · announced Aug 2025

    $900 million, 300 MW, 440 acres

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • Colocation in Round Rock

    Round Rock, Williamson County, Texas · Reported under construction · announced Jul 2025

    54 MW total, 18 MW first phase

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Bastrop County

    Bastrop County, Texas · Reported under construction · announced Jul 2025

    $1.44 billion campus, 578,000 sq ft, 140 acres

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Charlotte

    Charlotte, Mecklenburg County, North Carolina · Reported announced · announced Jan 2025

    122-acre powered shell campus

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-01. The undated official page reports grading underway; no dated vertical-construction milestone is confirmed.

    Public source
  • Hyperscale campus in West Charlotte

    West Charlotte, Mecklenburg County, North Carolina · Reported announced · announced Apr 2025

    3 million sq ft, up to 400 MW, 156 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-04. Historical source report; current project status has not been independently confirmed.

    Public source
  • Colocation in Henrico County

    Henrico County, Virginia · Reported under construction · announced Feb 2025

    $1 billion, 66 acres, 200+ MW

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-07-15. Groundbreaking and completed precast structure reported for the first facility; not full-campus operation.

    Public source
  • Hyperscale campus in Caroline County

    Caroline County, Virginia · Reported under construction · announced Nov 2025

    $3 billion, nearly 1 GW

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Cedar Rapids and Council Bluffs

    Cedar Rapids and Council Bluffs, Iowa · Reported announced · announced May 2025

    $7 billion investment

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-05-30. Construction was reported for Cedar Rapids. The statewide investment also includes other components; this does not establish every component's status.

    Public source
  • AI campus in Ankeny

    Ankeny, Polk County, Iowa · Reported under construction · announced Mar 2025

    13.2 MW, 105,000 sq ft

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-08-06. Structural topping out reported; operation is not confirmed.

    Public source
  • AI campus in Council Bluffs

    Council Bluffs, Pottawattamie County, Iowa · Reported under construction · announced Oct 2025

    200 MW

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-10-29. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Memphis

    Memphis, Shelby County, Tennessee · Reported under construction · announced Mar 2025

    1 million sq ft site

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Richland Parish

    Richland Parish, Louisiana · Reported under construction · announced Dec 2024

    Planned 5 GW expansion; more than $50 billion regional investment

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-07-13. The July 2026 expansion announcement updates the regional investment and planned capacity; no full-campus operation is established.

    Public source
  • AI campus in Mount Pleasant

    Mount Pleasant, Racine County, Wisconsin · Reported under construction · announced Sep 2025

    $7 billion total investment

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-06-23. The first facility was reported operational on June 23, 2026. This does not establish completion of the entire campus.

    Public source
  • Hyperscale campus in Port Washington

    Port Washington, Ozaukee County, Wisconsin · Reported under construction · announced Aug 2025

    $15 billion overall campus; $8 billion first phase

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-12-19. Groundbreaking reported; the first-phase budget is not the entire campus budget.

    Public source
  • Hyperscale campus in Salem Township

    Salem Township, Luzerne County, Pennsylvania · Reported under construction · announced Jun 2025

    Part of a $20 billion two-campus plan

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-06. The undated official page lists active construction in Salem Township; no current completion date is confirmed.

    Public source
  • Hyperscale campus in Falls Township

    Falls Township, Bucks County, Pennsylvania · Reported under construction · announced Jun 2025

    Part of a $20 billion two-campus plan

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-06. The undated official page lists active construction in Falls Township; no current completion date is confirmed.

    Public source
  • AI campus in Elk Grove Village

    Elk Grove Village, Cook County, Illinois · Reported announced · announced Mar 2025

    36 MW, 263,000 sq ft

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Grayslake

    Grayslake, Lake County, Illinois · Reported under construction · announced Feb 2025

    1.2 GW IT capacity, 20 buildings

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2026-10-16. October reporting says construction started in August; operation is not confirmed.

    Public source
  • Colocation in Hillsboro

    Hillsboro, Washington County, Oregon · Reported announced · announced Sep 2025

    27 MW, 350,000 sq ft

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. The reviewed source did not provide validated dated evidence for the stored status and scope. Status evidence: 2025-09. Historical source report; current project status has not been independently confirmed.

    Public source
  • Cable landing station in Palm Coast

    Palm Coast, Flagler County, Florida · Reported under construction · announced Jul 2025

    One approved building, 33,760 sq ft

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-06-19. The city reported construction underway June 19, 2026, with one permitted cable landing station. No second building is approved; this is not a hyperscale campus.

    Public source
  • Data center groundbreaking in Miami

    Miami, Miami-Dade County, Florida · Reported under construction · announced Feb 2025

    16 MW, 150,000 sq ft

    Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-02-26. Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.

    Public source
  • Hyperscale campus in Laramie County

    Cheyenne, Laramie County, Wyoming · Reported under construction · announced Oct 2025

    $1.2 billion, 250 MW, 113 acres

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Cass County

    Harwood, Cass County, North Dakota · Reported announced · announced Aug 2025

    $3 billion, 280 MW initial campus design

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Wyandotte County

    Kansas City, Wyandotte County, Kansas · Reported announced · announced Jul 2025

    $2.4 billion, about 200 MW critical IT, 66 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-07. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Wyandotte County

    Kansas City, Wyandotte County, Kansas · Reported announced · announced Jun 2025

    $12 billion, 600 MW, 500+ acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-06. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Clay County

    Kansas City, Clay County, Missouri · Reported announced · announced Mar 2024

    $1 billion

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-03. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Jefferson County

    Louisville, Jefferson County, Kentucky · Reported announced · announced Jan 2025

    400 MW, first 130 MW targeted for Oct 2026

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Aiken County

    Aiken, Aiken County, South Carolina · Reported announced · announced Aug 2024

    $800 million, 715,000 sq ft

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Dorchester County

    St. George, Dorchester County, South Carolina · Reported under construction · announced Sep 2024

    Part of a $2 billion two-campus investment

    Pending: dated source confirmation of the reported status is still needed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-09. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Montgomery County

    Montgomery, Montgomery County, Alabama · Reported announced · announced May 2024

    $800 million, 715,000 sq ft

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-05. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Madison County

    Canton, Madison County, Mississippi · Reported announced · announced Jan 2024

    $10 billion across two county data-center complexes

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-01. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Lauderdale County

    Meridian, Lauderdale County, Mississippi · Reported announced · announced Jan 2025

    About $10 billion at full build, about 500 MW, eight buildings

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-01. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Rankin County

    Brandon, Rankin County, Mississippi · Reported announced · announced Aug 2025

    $6 billion

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Warren County

    Vicksburg, Warren County, Mississippi · Reported announced · announced Nov 2025

    $3 billion

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-11. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Dakota County

    Rosemount, Dakota County, Minnesota · Reported announced · announced Mar 2024

    $800 million, 715,000 sq ft, 280 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2024-03. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Washtenaw County

    Saline Township, Washtenaw County, Michigan · Reported announced · announced Oct 2025

    $7 billion, 1+ GW

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-10. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Cumberland County

    Vineland, Cumberland County, New Jersey · Reported announced · announced Mar 2025

    300 MW

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-03. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Tompkins County

    Lansing, Tompkins County, New York · Reported announced · announced Aug 2025

    Up to 400 MW, about 183 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Doña Ana County

    Santa Teresa, Doña Ana County, New Mexico · Reported announced · announced Sep 2025

    $50 billion initial investment over five years

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-09. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Richmond County

    Rockingham, Richmond County, North Carolina · Reported announced · announced Jun 2025

    $10 billion

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-06. Historical source report; current project status has not been independently confirmed.

    Public source
  • Hyperscale campus in Minnehaha County

    Sioux Falls, Minnehaha County, South Dakota · Reported announced · announced Aug 2025

    500 MW power load, 160 acres

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-08. Historical source report; current project status has not been independently confirmed.

    Public source
  • AI campus in Deuel County

    Toronto, Deuel County, South Dakota · Reported announced · announced May 2025

    Up to $16 billion, 430 MW IT

    Pending: project announced; construction or operation is not confirmed.

    Unconfirmed status report. Added from a dated public report; current status not independently confirmed. Status evidence: 2025-05. Historical source report; current project status has not been independently confirmed.

    Public source

Staffing mechanical work on a data center project?

Submit a job order for mechanical project management, field supervision, building controls or chilled-water service. We recruit for commercial mechanical contractors building and maintaining critical facilities.

  • Data center recruiter
  • Mechanical project managers
  • Mechanical superintendents
  • Chiller service technicians
  • BAS / controls technicians

Submit a job order

Featured hiring & salary guides

  • HVAC Service Manager Salary by Metro (2026)
  • Mechanical Superintendent Salary Guide (2026)
  • Controls / BAS Project Manager Salary Guide (2026)
  • How to Hire a Piping Superintendent (2026 Playbook)
  • Open Jobs
  • For Employers
  • For Candidates
  • Candidate Hub
  • 2026 Salary Guides
  • All Insights
  • Hiring & Salary Guides
  • Meet the Team
  • Regional Trade Reports
  • Local Unions Directory
  • Markets We Recruit In
  • Building Types We Staff
  • Hospital Mechanical Careers
  • Data Center Mechanical Careers
  • Semiconductor Plant Mechanical Careers
  • Laboratory Mechanical Careers
  • Arena & Stadium Mechanical Careers
  • High-Rise Mechanical Careers
  • Mixed-Use Mechanical Careers
  • Office Building Mechanical Careers
  • School & University Mechanical Careers
  • Hotel & Casino Mechanical Careers
  • Industrial Mechanical Careers
  • About Gulfstream SP
  • Contact
  • Trust & Security
  • Privacy Policy