Palm Coast, Flagler County, Florida · cable landing station · One approved building, 33,760 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2026-06-19. The city reported construction underway June 19, 2026, with one permitted cable landing station. No second building is approved; this is not a hyperscale campus.
Source checked 2026-10-22; not a current-status confirmation.
Project status source · Project directory · Project map
Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.
Not verified
Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.
Not verified
Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.
Not verified
Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream
Announced Jul 2025. Reported under construction; The city reported construction underway June 19, 2026, with one permitted cable landing station. No second building is approved; this is not a hyperscale campus.