Miami, Miami-Dade County, Florida · colocation facility · 16 MW, 150,000 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-02-26. Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.
Source checked 2026-10-22; not a current-status confirmation.
Project status source · Project directory · Project map
Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.
Not verified
Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.
Not verified
Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.
Not verified
Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream
Announced Feb 2025. Reported under construction; Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.