Home › Project directory › Data center groundbreaking in Miami

Data center groundbreaking in Miami

Miami, Miami-Dade County, Florida · colocation facility · 16 MW, 150,000 sq ft

Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-02-26. Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.

Source checked 2026-10-22; not a current-status confirmation.

Project status source · Project directory · Project map

Equipment, design and construction

Equipment & systems

Equipment schedule, cooling configuration and manufacturer assignments are not verified in the reviewed project sources.

Not verified

Design scope

Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.

Not verified

Contractor & construction scope

Project-specific contractor work packages are not verified in the reviewed sources. Contractor identities are omitted.

Not verified

Reference guides—not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream

Timeline evidence

Announced Feb 2025. Reported under construction; Groundbreaking was reported on February 26, 2025. This does not establish completion or today's construction status.

See live openings

Featured hiring & salary guides

  • HVAC Service Manager Salary by Metro (2026)
  • Mechanical Superintendent Salary Guide (2026)
  • Controls / BAS Project Manager Salary Guide (2026)
  • How to Hire a Piping Superintendent (2026 Playbook)
  • Open Jobs
  • For Employers
  • For Candidates
  • Candidate Hub
  • 2026 Salary Guides
  • All Insights
  • Hiring & Salary Guides
  • Meet the Team
  • Regional Trade Reports
  • Local Unions Directory
  • Markets We Recruit In
  • About Gulfstream SP
  • Contact
  • Trust & Security
  • Privacy Policy