Ankeny, Polk County, Iowa · AI campus · 13.2 MW, 105,000 sq ft
Confirmed dated status report. Dated evidence supports the reported scope; current site status is not confirmed. Status evidence: 2025-08-06. Structural topping out reported; operation is not confirmed.
Source checked 2026-10-22; not a current-status confirmation.
Project status source · Project directory · Project map
The August 2025 topping-out announcement specifies advanced closed-loop waterless cooling for high-density AI workloads. It describes the planned cooling system, not evidence that the plant is commissioned or operational.
Official topping-out announcement · Source dated 2025-08-06 · Checked 2026-10-22
Project-specific engineering scope and design-team assignments are not verified in the reviewed sources.
Not verified
The project announcement identifies a design-build delivery team and reports structural topping out. No separate mechanical subcontractor work package is verified; team identities are omitted.
Official topping-out announcement · Source dated 2025-08-06 · Checked 2026-10-22
Reference guides-not this project's equipment suppliers or project team: Equipment · Company directory · Design & engineering · GC-side MEP roles · About Gulfstream
Announced Mar 2025. Reported under construction; Structural topping out reported; operation is not confirmed.