HVAC Project Manager placed in 21 days for a Southwest data center program

A top-25 ENR mechanical contractor had lost their lead PM on a $60M mission-critical retrofit six weeks into the project. Two national retained firms had been searching for 90+ days with no offer-stage candidates.

Approach

Gulfstream ran a targeted headhunt against 14 mission-critical mechanical contractors in the Southwest, pre-qualifying on chilled-water plant experience, Tier III+ data center delivery, and design-assist background. All outreach was direct-sourced (no job board) and screened against a written scorecard.

Outcome

Presented 4 qualified candidates in 9 business days. Offer accepted on day 21. The hire has since led buyout on a follow-on $40M expansion.

Results

  • Time to accepted offer: 21 days
  • Qualified candidates presented: 4
  • Prior search duration (competing firms): 90+ days
  • Placement retention (24 months): Active

Featured hiring & salary guides

  • HVAC Service Manager Salary by Metro (2026)
  • Mechanical Superintendent Salary Guide (2026)
  • Controls / BAS Project Manager Salary Guide (2026)
  • How to Hire a Piping Superintendent (2026 Playbook)
  • Open Jobs
  • For Employers
  • For Candidates
  • 2026 Salary Guides
  • All Insights
  • Hiring & Salary Guides
  • Meet the Team
  • Regional Trade Reports
  • Search Case Studies
  • Local Unions Directory
  • Markets We Recruit In
  • About Gulfstream SP
  • Contact